Crumb Rubber Production Line, Rubber Powder Production Line

Crumb Rubber Production Line, Rubber Powder Production Line

Crumb Rubber Production Line comma Rubber PowEPT Generation Line 500kg solHour

one interval One Hook DebeaEPTLSJ-1200
Structural functions
The blade of cutter is produced of alloy welding and the area is challenging wear-resisting period of time
On safety factor comma this EPT have protective body comma which can properly assure protection in the method of pulling out wire loop period of time
Motor and EPT comma and as a EPT comma the structure is compact interval
The EPT occupies the EPT flooring comma handy installation interval
Use colon
Pulling out the wire loops from the mouth of squander tires period of time
two time period Tire Cutter QDJ-1200
The basic principle is colon motor drives hydraulic program and the cylinder comma area the tire to lock arm comma fasten two blades rotating amongst tire and shear cylinders perform to transfer comma two blades rotating blades forming shear comma accomplish the effect of shear time period
Function colon
This tools comma great shear impact comma shearing speed comma lower strength intake comma modest volume comma handy comma because use the hydraulic technique comma straightforward operation and risk-free period of time
Mechanical description colon the tires a lot more than 800 want to cut comma and cut into four pieces in EPT periodthe dimension of piece is 200-500mm time period
Notes for utilizing tire cutter colon
a interval Examine the knives regularly comma if appear clear blunt comma it need to be keep timely comma and the service is two-three several years interval
b period of time the oil in hydraulic station need to be filtered and changed often interval EPTly filter after every single a single and 50 percent 12 months period
c time period Putting on areas colon rubber seals comma shipped with an additional established when ship the EPT to the buyer period of time

3 amp4 interval EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires smaller sized than 800mm tires time period At the EPT temperature comma can be place straight crushed into fifty ast fifty mm block comma so the next rotating can grind into ten-thirty meshes or wire and fiber separation tools period of time
Function colon
This EPT is a compact construction comma sophisticated technologies comma low strength usage comma higher performance comma smashing off the examination space for the framework comma upkeep is especially practical semi instruments with carbide surfacing technological innovation comma large hardness comma large put on resistance comma and repeated fix utilizing comma so has a EPTer services existence semi rotary monitor for the lattice composition of metal mesh comma blanking big region comma enabling the screening of competent rubber time period Following the partition of big tires can achieve the result of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can immediately be broken into 50 ast50 mm of rubber block period of time

Notes for employing EPT tire shredder colon
a period of time Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma main bearings use calcium-primarily based grease lubrication comma 3 months after the operation of the EPT comma the oil must be replaced and clear the fuel tank period Because then change the oil when time every single yr period
b Soon after deal with 3 comma000 tons of waste rubber lparin regular circumstances rpar commathe consumer ought to grind the blade chopping edge once time interval The blades is the wear elements comma the EPT services existence is 5-six years comma when offering the EPT to the buyer comma the shredEPTwill be outfitted with edge hardness layer patching content lparelectrodes rpar period of time
5 time period Double Rolls Rubber Crusher XKP-560
Use colon
Primarily employed for crack large rubber blocks into forty-50mm little rubber blocks interval
Technological parameters colon
Framework colon The rollers adopt alloy chilly challenging forged irons with use-resisting comma tough figures interval The mill flour is with teeth comma higher groove period
In orEPTto lengthen the provider life of the cracker comma we propose build foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and tough equipment floor EPT with lower sounds and EPTer services daily life period
5Our crackers are developed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful operating platforms comma all the wires will be connected well from managing method to motor time period When employing the EPT comma the customers just require to hook up right to the EPT period

Crumb Rubber Production Line comma Rubber PowEPT Production Line 500kg solHour

No period Name Model Qty period of time
lparQty rpar
Motor EPT lparKW rpar
1 Solitary hook debeader LSJ-1200 one 11
two EPT tyre cutter QDJ-1200 1 five period5
three amp4 EPT tyre shredder
lparwith conveyor rpar
ZPS-900 one sixty one period5
five Double Rolls Rubber Crusher XKP560 one 90
6 Massive conveyor gear BCL-eight one 2
seven Small conveyor tools BCL-3 one 1 period1
eight Massive Magnet separator BMS22 one 2 period2
nine Modest Magnet separator SMS-1 one 1 period1
10 Huge Shaking monitor BSS-8 one 7 period5
eleven Little Shaking monitor SSS-3 one 3
12 Fiber separator FS110 one five period5
thirteen Good Rubber Powder Pulverizing EPT XJFS-420 4 123
Sq. vibrating sieve 600 one
Rubber powder collector JFS500 1 seven period5 plus0 period75 equals8 period25
Screw conveyer Phi200mm 1 period75
Screw conveyer Phi132mm 1 period75
Storage pin one period5cbm one
Hopper one
Belt conveyer one period75
fourteen Steel Baller EPT 30T 1 7 period5
15 Rubber powder EPT EPT one 3
24 334 period4KW

Crumb Rubber Production Line, Rubber Powder Production Line

Crumb Rubber Production Line, Rubber Powder Production Line